Concrete Contractor in Mukilteo, WA | Concrete Installation & Repair

Everett Expert Concrete brings over 15 years building on Snohomish County’s steepest lots, and in Mukilteo that means retaining walls, catch basins, and driveways designed for hillsides that push back. We always check the base and forms on every hillside job before a single yard of concrete is poured.

CONTACT FORM

Fill in the form to get a free initial quotation.

Projects We've Completed In Mukilteo, WA

Concrete Driveway and Retaining Wall Installed at a Hillside Home

This Mukilteo home is cut into a wooded hillside, and the old driveway had cracked where the slope pushed against it and water ran straight toward the garage doors. The owners needed a driveway that could hold up to the hill and a way to keep the bank from sliding onto it. We built a reinforced concrete retaining wall along the uphill side, with drainage behind it so water can’t build up against the wall, then dug out the soft soil and poured a new 6-inch driveway over compacted crushed rock. A catch basin in the middle of the slab collects runoff before it reaches the garage, and the exposed aggregate finish gives tires grip on wet mornings. The wall and driveway were completed over two weeks.

Exposed Aggregate Front Porch Step Installed at a Mukilteo Home

The front porch on this Mukilteo home was a thin concrete slab that had cracked around the columns and turned slick every time it rained. The owners wanted it to match the stone and shingle exterior and feel safe in wet weather. We removed the old slab, set new forms around the porch columns, and poured an exposed aggregate porch with a single wide step down to the walkway. The pebble finish gives natural grip without a rough broom texture, and the porch slopes slightly away from the front door so rain drains toward the yard. The porch was formed, poured, and finished in two days.

Shared Concrete Driveway Installed at a Mukilteo Duplex

This new modern duplex in Mukilteo needed one large shared driveway serving both units, with room to turn around in front of each garage. We poured a 6-inch reinforced slab over compacted crushed rock and laid out the control joints in a clean, oversized grid that lines up with the garage doors and the walkways. The driveway pitches toward the street and the lawn edges so water never sheds toward either building, and a light broom finish keeps it from getting slippery. The full driveway was poured in two phases over five days so both units kept access during construction.