Concrete Contractor in Bothell, WA | Concrete Installation & Repair

Everett Expert Concrete brings over 15 years of experience to Lynnwood, from mid-century driveway and step replacements to curbs for local businesses and pool decks for apartment complexes.

CONTACT FORM

Fill in the form to get a free initial quotation.

Projects We've Completed In Bothell, WA

Concrete Driveway and Entry Steps Installed at a Lynnwood Home

The owners of this mid-century Lynnwood home were updating the exterior and wanted the driveway and front entry to match the clean, low lines of the house. The old driveway was cracked and patched, and the path to the door was a steep set of worn steps. We replaced the driveway with a 6-inch slab over compacted crushed rock, saw-cutting the control joints into a clean grid that lines up with the carport. Then we built wide, shallow concrete steps up to the entry, with a raised concrete planter curb along one side to hold back the landscaping. The driveway and steps were poured over five days.

Curved Concrete Curbs and Landscape Islands Installed at a Lynnwood Bank

A bank in Lynnwood was redoing its parking lot landscaping, and the old square curbs around the planting islands were chipped, broken, and getting clipped by cars turning into the drive-through lane. We tore out the damaged curbing and formed new curved concrete curbs around each island, with smooth radius ends so drivers can turn without catching a tire. The new curbs hold the landscape beds and bark in place and keep runoff from washing soil onto the pavement. We phased the work after business hours so the branch and drive-through stayed open, and the curbing was finished in under one week.

Cracked Pool Deck Replaced at a Lynnwood Apartment Complex

The pool deck at this Lynnwood apartment complex had cracked and settled in several places, leaving uneven edges and trip hazards around the water. The property manager wanted it replaced before summer. We removed the damaged sections down to the base, recompacted the soil and crushed rock, and poured a new deck that follows the curve of the pool and the raised sun shelf. The surface got a light broom finish for grip on wet feet, and we sloped it away from the pool so rain and splash water drain off instead of pooling. The deck was replaced in five days, and the pool opened on schedule.